RIG JACKING-DOWN AND LEG-PULLING OUT
降船及拔樁
1、 Everything’s ready for the move? Has the unloading finished?
準(zhǔn)備工作做得怎么樣?卸載做完沒有?
2、 They are working to remove the wedges?
現(xiàn)在正在拔樁腳楔塊。
3、 The derrick has been skidded to the towing position?
井架已移到適航位置。
4、 Drop NO.2 anchor first,and then No.3.
先拋2號錨,后拋3號錨。
5、 How far are going to lay out the anchor line?
錨纜繩需要放多少?
6、 Keep five warps on the drum and lay out the rest.
盡可能放,滾筒上留5圈。
7、 We ’ve got through with the anchors,It ’s ready for the boat to connect now.
已拋完錨,可以接拖了。
8、 Have you got emergency equipments ready for the moving?
拖航作業(yè)的應(yīng)急器材準(zhǔn)備完了嗎?