日日噜噜夜夜爽爽_国产精品青青在线麻豆_亚洲av不卡一区二区三区_性直播视频在线观看黄_国产成人小午夜视频在线观看

墨西哥灣深水水平井鉆井平臺起火沉沒事故

[加入收藏][字號: ] [時(shí)間:2010-05-27  來源:博研論壇  關(guān)注度:0]
摘要:   You may have heard the news in the last two days about the Deepwater Horizon drilling rig which caught fire, bur...


  You may have heard the news in the last two days about the Deepwater Horizon drilling rig which caught fire, burned for two days, thensank in 5,000 ft of water in the Gulf of Mexico.  There are still 11 men missing, and they are not expected to be found.  
The rig belongs to Transocean, the world’s biggest offshore drilling contractor.  The rig was originally contracted through the year 2013 to BP and was working on BP’s Macondo exploration well when the fire broke out.  The rig costs about $500,000 per day to contract.  The full drilling spread, with helicopters and support vessels and other services, will cost closer to $1,000,000 per day to operate in the course ofdrilling for oil and gas. The rig cost about $350,000,000 to build in 2001 and would cost at least double that to replace today.


Nautilus, being transported on a Heavy-Lift vessel


  The rig represents the cutting edge of drilling technology.  It is a floating rig, capable of working in up to 10,000 ft water depth.  The rig isnot moored; It does not use anchors because it would be too costly and too heavy to suspend this mooring load from the floatingstructure.  Rather, a triply-redundant computer system uses satellite positioning to control powerful thrusters that keep the rig on station within a few feet of its intended location, at all times. This is called Dynamic Positioning.
The rig had apparently just finished cementing steel casing in place at depths exceeding 18,000 ft.  The next operation was to suspend the well so that the rig could move to its next drilling location, the idea being that a rig would return to this well later in order to complete the work necessary to bring the well into production.
It is thought that somehow formation fluids – oil /gas – got into the wellbore and were undetected until it was too late to take action.  With a floating drilling rig setup, because it moves with the waves, currents, and winds, all of the main pressure control equipment sits on the seabed – the uppermost unmoving point in the well. This pressure control equipment – the Blowout Preventers, or ‘BOP’s” as they’re called, are controlled with redundant systems from the rig.  In the event of a serious emergency, there are multiple Panic Buttons to hit, and even fail-safe Deadman systems that should be automatically engaged when something of this proportion breaks out.  None of them were aparently activated, suggesting that the blowout was especially swift to escalate at the surface.  The flames were visible up to about 35 miles away.  Not the glow – the flames.  They were 200 – 300 ft high.
 

上一頁12345下一頁


          您的分享是我們前進(jìn)最大的動力,謝謝!
關(guān)于我們 | 會員服務(wù) | 電子樣本 | 郵件營銷 | 網(wǎng)站地圖 | 誠聘英才 | 意見反饋
Copyright @ 2012 CIPPE.NET Inc All Rights Reserved 全球石油化工網(wǎng) 版權(quán)所有
京ICP證120803號 京ICP備05086866號-8 京公網(wǎng)安備110105018350
巴里| 抚顺市| 彩票| 林口县| 绥滨县| 双流县| 宣城市| 蒙自县| 临安市| 酒泉市| 突泉县| 凯里市| 万荣县| 石景山区| 永靖县| 太仓市| 涟源市| 玛纳斯县| 台中县| 闵行区| 长阳| 三河市| 同江市| 大姚县| 井研县| 黑河市| 万年县| 淮安市| 故城县| 鄂伦春自治旗| 盐边县| 新绛县| 迁安市| 资兴市| 湟中县| 墨竹工卡县| 兰溪市| 龙门县| 西畴县| 思茅市| 盐山县|