日日噜噜夜夜爽爽_国产精品青青在线麻豆_亚洲av不卡一区二区三区_性直播视频在线观看黄_国产成人小午夜视频在线观看

導(dǎo)航:全球石油化工網(wǎng) >> 資訊頻道 >> 技術(shù)裝備

貝克石油工具公司的多層壓裂完井工具(英)

[加入收藏][字號(hào): ] [時(shí)間:2009-01-15 JPT 關(guān)注度:0]
摘要:簡(jiǎn)介:從致密頁(yè)巖層采氣通常需要大量資金投資在泵上,并且成功的機(jī)率很低。貝克石油公司開(kāi)發(fā)出裸眼壓裂完井系統(tǒng)以改變這種局面,它能簡(jiǎn)化壓裂操作步驟,并將不盈利的項(xiàng)目轉(zhuǎn)化成盈利。 Producing gas from tight ...
簡(jiǎn)介:從致密頁(yè)巖層采氣通常需要大量資金投資在泵上,并且成功的機(jī)率很低。貝克石油公司開(kāi)發(fā)出裸眼壓裂完井系統(tǒng)以改變這種局面,它能簡(jiǎn)化壓裂操作步驟,并將不盈利的項(xiàng)目轉(zhuǎn)化成盈利。



Producing gas from tight shale formations typically requires major pumping investments with little guarantee of success. Baker Oil Tools aims to change this scenario with its Frac-Point Open-Hole Fracture Completion System, designed to simplify the fracturing process and turn otherwise unprofitable projects into moneymakers. 

Fracturing a horizontal, tight-gas well traditionally was done by either pumping frac fluid into the open hole and hoping for the best or isolating multiple zones by repeatedly cementing, plugging, perforating, and fracturing, a process that includes multiple trips, pumping trucks on standby for days at a time, and the expense and risk of perforating. 

Frac-Point is designed to improve this process in several ways. The system eliminates the costly cycle of cementing, plugging, and perforating, and it enables up to eight fracture placements in one trip, with a high degree of accuracy, the company says. The operator gains greater control of the frac treatment and a greater chance of fracturing the entire length of the lateral and increasing production. 

The system consists of four primary components: 

• The liner top packer, a hydraulic set permanent production packer with a tieback sleeve designed to carry up to 200,000 lb of liner assembly
• A short radius open-hole packer, featuring a patented antiextrusion packing element system
• Frac sleeves, including appropriately sized ball seats. The sleeves are actuated open sequentially by deploying balls from the surface, and the balls and seats are designed to be milled up to allow for a full opening production inner diameter to be maintained throughout the system, if needed
• Pressure-actuated sleeves, which are similar to the frac sleeves but do not contain a ball seat. 

The components work in tandem to isolate intervals of a horizontal section and pinpoint fracture treatment placement. Because it is a one-trip system, fracture treatments for each section can be pumped on the same day, which eliminates having to mobilize and demobilize pumping equipment. 

A major challenge of completing high-angle wells in open hole is getting tools through doglegs and other restrictions to total depth. The system’s packers are shorter for navigation through tight spots, and the company’s torque and drag software estimates the probability of reaching total depth. 

To determine the economic feasibility of a project, the company’s reservoir analysis team models different completion scenarios and estimates well deliverability for specific well parameters. The process takes into account factors like reservoir size, temperature, pressure, permeability, fracture properties and projected gas prices.


關(guān)鍵字: baker frac completion 
關(guān)于我們 | 會(huì)員服務(wù) | 電子樣本 | 郵件營(yíng)銷(xiāo) | 網(wǎng)站地圖 | 誠(chéng)聘英才 | 意見(jiàn)反饋
Copyright @ 2011 CIPPE.NET Inc All Rights Reserved 全球石油化工網(wǎng) 版權(quán)所有 京ICP證080561號(hào)
宣城市| 东乡族自治县| 即墨市| 马鞍山市| 东阳市| 桦川县| 陈巴尔虎旗| 泌阳县| 故城县| 广昌县| 淄博市| 台湾省| 陆川县| 九龙县| 廉江市| 运城市| 龙山县| 新余市| 泗洪县| 黑山县| 广州市| 霍城县| 连山| 商丘市| 恭城| 白河县| 铜陵市| 建阳市| 永吉县| 安义县| 大悟县| 宜春市| 睢宁县| 贵港市| 辽宁省| 新巴尔虎右旗| 图木舒克市| 三门峡市| 米脂县| 项城市| 楚雄市|